AUTOPILOT ONBOARDING & INSTALLATION
Everything you need to prepare your site and install your AUTOPILOT: onboarding steps, on-site requirements and an illustrated installation guide.
A clean AUTOPILOT installation makes a real difference in how it performs day to day. Good preparation before installation day is the easiest way to get there.
1. Onboarding & Installation Preparation
Everything you need to get your site ready before installation day:
- The onboarding process from order to training, with typical lead times
- On-site requirements: internet connection, water supply, coolant piping and power
- Network requirements and mandatory network settings
- Piping options, maximum pipe lengths and recommended materials
- Where and how to install the sensor, tank adapter and ultrasonic sensor
- Common installation mistakes
- Delivery scope
- Required machine information and installation acceptance checklist
2. Installation Guide
An illustrated step-by-step guide for the installation itself.